Reading the current project without changing it.
Full Designer is active. All six stages and Layers remain available; choose Guided whenever you want the next applicable task.
Establish the working parcel, then collect sourced screening and field evidence.
Sandy ground vs high seasonal water table / silts is a large design-fee and system-type difference. Use SSURGO for screening; SHWT and perc remain professional/field determinations.
Use the map and Layers workspace for geometry; these tools assist the active layout.
Place the conveyance (POC / tank / D-box / bed), then run the QA checks.
No professional determinations open.
Complete project information and assemble the package. Every current work product remains available from Downloads in the header.
Look up or click a parcel, pull the layers, then assemble the package.